STEP 9: Passenger Side Step Bar Install

Updated September 2, 2026

This auction ended on September 3, 2026. See upcoming auctions from Bid Llama.
Lot number330
AuctionThursday Liquidation Auction - Birmingham, AL - 09/03/26
DateSeptember 3, 2026 at 6:00 PM CDT
Auction houseBid Llama
LocationBirmingham, Alabama

Condition: New - Open Box In Packaging?: Yes Assembly Required?: No Damaged?: No Functional?: Yes Missing Parts?: No UPC: NOUPC{19744863} STEP 9: Passenger Side Step Bar Installation Once Passenger side 2#, 3#, 4# and 5# mouriting brackets are installed, then proceed to the Step Bar 1. Select (1) Slider and (2) B1 (M8X1.25-35mm Carriage Bolts); 2. Install (2) B1 (M8X1.25-35mm Carriage Bolts) in (1) Slider. 3. Slide the Slider with carriage bolts into the Step Bar Channel. 4. Repeat to install the other (4) sliders to the step bar. 5. Attach the Step Bar with the Sliders onto the installed mounting brackets. Position the Sliders to the Step Bar to the installed Brackets by: (8) B1 (M8X1.25-35 Carriage Bolts) (8) B2 (M8 Large Flat Washers) (8) B3 (M8 Nylon Lock Nuts) (4) Sliders Note: *Do not fully tighten hardware at this time. *The Sliders are packed with the Step Bars.

More lots in this auction

See all lots in Thursday Liquidation Auction - Birmingham, AL - 09/03/26 →